Transplant day one is done, here's the progress so far.
This is basically a 75% dry fit, I haven't soldered or run any wires and there's going to be a second battery on the platform thats on the bottom side rear of the frame. The Here GPS is going in front of the motherboard and the gimbal controller will be on top of the gimbal platform, behind the yaw motor.
Speaking of the gimbal, I'm pretty sure that I won't be able to leave it so far forward, so it'll probably be hung lower and scooted back some.
I've got some 350kv pancake motors already and some 750kv pancakes on the way, not sure if I'll go with the 350s, 750s, or both in an X8 configuration.
Am I making any obvious mistakes?
Comments? Concerns? Criticism? Suggestions?
This is basically a 75% dry fit, I haven't soldered or run any wires and there's going to be a second battery on the platform thats on the bottom side rear of the frame. The Here GPS is going in front of the motherboard and the gimbal controller will be on top of the gimbal platform, behind the yaw motor.
Speaking of the gimbal, I'm pretty sure that I won't be able to leave it so far forward, so it'll probably be hung lower and scooted back some.
I've got some 350kv pancake motors already and some 750kv pancakes on the way, not sure if I'll go with the 350s, 750s, or both in an X8 configuration.
Am I making any obvious mistakes?
Comments? Concerns? Criticism? Suggestions?



